Assembly Process

CF8 control valve plug and stem assembly01

Plug and Stem AssemblyMachined plug and stem prepared for internal fit-up.

Machined CF8 control valve body cavity02

Body and Seat AreaMachined body cavity and seating area checked before assembly.

Control valve bonnet and bolting preparation03

Bonnet PreparationBonnet, bolting and actuator mounting interface prepared for fit-up.

8 inch Class 150 CF8 control valve workshop assembly04

Workshop AssemblyBody and bonnet components aligned and secured during assembly.

Pneumatic Control Valve Assembly Record

This production case records the workshop assembly of an 8-inch Class 150 CF8 pneumatic control valve. The photographs and assembly video show the main body, bonnet, plug-and-stem components and final pneumatic actuator installation.

Design StandardASME B16.34
Face-to-FaceASME B16.10
Flange StandardASME B16.5
Test StandardAPI 598

Assembly and inspection focus

  • Identification and visual inspection of the CF8 body, bonnet, plug, stem and related internal components.
  • Fit-up of the plug-and-stem assembly within the machined body and seating area.
  • Bonnet alignment, bolting sequence and actuator mounting interface checks.
  • Installation and functional positioning of the pneumatic diaphragm actuator and positioner.
  • Final inspection and pressure testing in accordance with API 598 and the approved project documents.

Project release basis

Final acceptance remains subject to the approved drawing, datasheet, inspection and test plan, actuator configuration and project-specific documentation requirements. Flow characteristic, fail action, leakage class, trim selection and instrument accessories should be confirmed in the purchase order.